Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

25 October 2021

Accelerator

Klystron Gallery

RF power tests are ongoing in the Klystron Gallery. Three RF power stations have been tested in their final position in RF cell 120. The fourth and last RF power station for cell 120a is currently subject to tests inside Test Stand 3.

Cryomodules

RF warm conditioning of the medium beta cryomodule placed inside the bunker was completed this week, with cooldown of the four cavities following.

Another serial-produced cryomodule has been delivered to ESS from CEA in France this week.

Four spoke cryomodules, fully tested at the Freia lab at Uppsala University, are currently stored in the ESS technical workshop building.

Target

Port tubes 

Welding of port tubes to the vacuum vessel is ongoing in the area surrounding the Target Monolith. A team from ENSA, contracted by in-kind partner ESS Bilbao, is performing the works.

Cryogenic Moderator System (CMS)

Delivery of the cryogenic moderator system is expected soon, with installation on the top floor of the Accelerator to Target building planned to follow on 10 November. A crane will lift the over 5 tonnes heavy piece from ground level and up to the Target roof level. A temporary wall will be removed, and later overpressure vents, so called explosion hatches, will be installed here.

Cantilever roof cladding

Mounting of aluminium lamellae on the Target roof structure has continued, and the panels on the east end of Experimental Halls 1 and 2 are substantially completed, leaving just the area above the Accelerator dog leg connecting to the Accelerator to Target façade.

Bolts are in place for the roof corner over D03 hall connecting to the cladding above D04 lab, with panels to be mounted soon.

Accelerator to Target building

The external staircase for the Accelerator to Target (A2T) building has been subject to installation. Lighting will be fitted.

Experimental Halls & Labs

Bunker crane

The reinforcement works for the bunker crane inside Experimental hall 2 were successfully completed. The same works are now nearing completion on the Experimental Hall 1-side, with a view to finalise the outer runway and remove the scaffolding by the end of the week.

LOKI

Drilling and installation of anchors for the instrument LOKI continue inside Experimental Hall 2, for base plate installation to follow. This is the first part of the on site installation for the LoKI instrument at ESS.

BIFROST

Metal stairs are to be installed from the ground to the roof level of the BIFROST scientific cave. This will facilitate access when a roof hatch is opened and items lifted in with the cave jib crane.

The detector vacuum vessel has been temporarily lifted out from the cave, to allow for the fitting of lining with thin cadmium sheets.

RML lab

On the ground floor of lab building D08, ESS and contractor Sanber Ltd, working under the STFC UK in-kind agreement for lab installations at ESS, are progressing with the installation of a Radioactive Materials Lab (RML). In-ceiling installations, piping and an emergency shower are in place, and the lab equipment to be installed has arrived on site. Fume hoods for the RML lab was already installed this summer.

Civil construction - towards completion

All remaining areas, in the Target station and adjacent buildings, subject to completion by ESS civil construction partner Skanska, have been subject to pre-inspections and site acceptance testing is in preparation for handover. 

The last few sectional handover inspections will be held in coming days, with sectional handover meetings for all remaining buildings following in November. Final handover is scheduled for December. 

Earthworks

The SEC civil works team has substantially completed the earthworks and asphalting on the entire site. Final works include the ditches along Southern Gallery Road and planting of trees in prepared areas within Circular Road as well as the hilly landscaped area established in the south parts of the ESS site.

Siteplan Archive
A2t external stairs

External stairs are in place for the Accelerator to Target (A2T) building.

A2T view

View from the dog leg of the Accelerator building to the Target building.

D01 bunker

Reinforcement works are ongoing behind scaffolding surrounding the bunker crane structure in Experimental Hall 1.

D02 Monolith R6 port tubes

Port tubes – 39 in total - are welded in place on the Monolith vacuum vessel.

D03 bunker crane consoles

Bunker crane runways have been fully reinforced inside Experimental Hall 2.

D03 corner sombrero

Last corner of the northwest cantilever roof is ready for cladding panels.

D03 LoKI base plate

Anchors are drilled to the concrete floor marking the positions for base plates for the LoKI instrument cave.

D08 RML lab

Piping and connections are in place for more equipment to be installed next to the fume hoods in the Radioactive Materials Lab.

E01 BIFROST cave.

A staircase for BIFROST roof level has been delivered and is ready to be installed.

G02 NCG

RF power tests are ongoing in the normal conducting gallery.

G02 TS2

The “RF on” sign is lit, as conditioning and cooldown of the cryomodule cavities are ongoing inside the bunker.

© ESS. All rights reserved

Footer menu

  • Login
  • Privacy
  • SRE ESS