Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

28 February 2022

Accelerator

Normal Conducting Linac

This week, re-characterisation in the ion source has been performed. This process produces proton plasma, and the LEBT faraday cup is used to collect the beam. Shortly, reconditioning of the RFQ section will follow.

DTL1, the first drift tube linac tank, is fully installed and a test readiness review has been held. Planning for the upcoming safety readiness review is ongoing. This will allow for beam commissioning up to the DTL1 faraday cup later this year.

Spoke Linac

Welding of header units, the pipes connecting the valve boxes for the cryogenic distribution system in the spoke section, is in progress.

Soak testing of the RF power stations in spoke cell 120 is ongoing. This involves simulating with operational power load over a longer period of time, to verify the system’s endurance and reliability.

Cryomodule testing

The third medium beta cryomodule subject to serial testing is inside the test stand 2 bunker. RF warm conditioning has been performed and cool down is under way.

Target

Monolith

A 4-metre-tall vessel has landed on the proton beam window port block, located next to the Monolith vessel. In here, rails will be installed to slide down the proton beam window, an important device in  separating the ultra-high vacuum of the accelerator from the atmosphere in the Target Monolith.

The Monolith vessel has been meticulously cleaned on the inside by the ESS vacuum team. The lid is now on and all port tubes have been closed with end plates. Next up are pressure and leak tests, to verify that the confinement is tight.

Meanwhile, the Target wheel and shaft are on route to Sweden from in-kind partner ESS Bilbao, with arrival scheduled for next week. The transport will make a quick touch-down in Lund to quality check the goods, after which the wheel will go to Malmö for luminescent coating of the surface.

ESS main control room

Electrical infrastructure installations are completed for the ESS main control room located on the first floor of the Target Entrance building. ESS Integrated Control System (ICS) division is now preparing network cables and set-up, including loading of required software on the operator machines. The room will be populated with furniture, computers and screens.

There will be 12 workstations and screens along the walls to monitor operations. First to move in will be the Accelerator operations team.

Experimental Halls

LOKI

The very first neutron guide at ESS is in place in beamline N7 for instrument LOKI. Top wall bunker blocks were temporarily removed to allow for the installation and grouting of a feed-through casing (a so-called sleeve). In here, the 4-tonnes component containing the neutron guide was placed. This will now be aligned to micrometre precision, after which grouting of the sleeve lid and repositioning of the blocks can take place.

ODIN

Construction of the control cabin with sample preparation and storage area for instrument ODIN is under way in Experimental Hall 1.

Several truckloads of precast elements have arrived on site and installation of the first and second floor of the building is in progress. A staircase with handrails will follow.

DREAM

Next to ODIN in the same hall, a control cabin is also being built for the instrument DREAM. The cave structure for DREAM has been erected and painted.

Neutron shielding bunker

The heavy concrete elements for the first layer of the roof for the west sector bunker was lifted in place this week.

Inside the bunker, infrastructure works are ongoing, with cable trays and ducting mounted.

Siteplan Archive
D02 PBW port block and vessel

Vessel connected to the proton beam window port block.

D02 vacuum cleaning the vacuum vessel

The ESS vacuum team vacuum cleaning the vacuum vessel.

D03 LOKI neutron guide lift

A neutron guide is lifted in place for instrument LOKI.

D01 DREAM hutch

A control cabin for instrument DREAM is under construction.

D01 ODIN hutch

ODIN control cabin, sample preparation and storage area.

D03 LOKI neutron guide in wall

The first neutron guide for ESS has been placed in beamline N7, for LOKI.

D03 west sector bunker infra

Infrastructure under the west sector bunker roof.

G01 Spokes header units welding

Internal weld of a header unit for the spoke linac completed. The metal sleeve to go on top will also be welded in place.

G02 Spokes RF power stations

Radio-frequency power production in spoke cell 120.

D03 west bunker roof elements

The ESS rigging team at work – 27 concrete elements were lifted to the west sector bunker roof.

D03 LOKI view to bunker

LOKI detector vessel, looking towards the neutron shielding bunker.

D02 Target Monolith

Target Monolith vessel.

© ESS. All rights reserved

Footer menu

  • Login
  • Privacy
  • SRE ESS