Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

9 May 2022

Bunker wall inserts

This week the bunker wall insert for instrument BIFROST was installed in beamline W4 in the west sector of the bunker. The stainless-steel insert contains elliptically profiled copper optics, which will guide the neutrons from the spallation process in Target to the instrument’s sample position. This neutron guide for BIFROST is delivered by in-kind partner Paul Scherrer Institute (PSI) in Switzerland, with Swiss Neutronics aligning and vacuum-testing the built-in neutron optics pre-installation.

The bunker wall inserts for ODIN and C-SPEC will be next.

ODIN and DREAM

The construction of the ODIN control cabin is in its final stages, with internal finishes and installations almost completed. Construction of the instrument cave will start soon.

Test lifts of the adjusted roof elements for the DREAM cave were performed this week, with internal finishes subject to completion inside the adjacent control cabin. These two instruments occupy the south sector beamlines in Experimental Hall 1.

Bunker cranes

The first of the two bunker cranes has been lifted in place inside Experimental Hall 2. Site Acceptance Tests, including load capacity testing, will follow. The crane on the other side, in Experimental Hall 1, is following. These cranes are necessary for NSS to perform the installation of heavy equipment inside the bunker, as well as for placing all roof elements eventually closing the bunker.

LSS frames

The installation of frames for the so-called Light Shutter System (LSS) has started inside the bunker, with the eight frames for the west sector of the bunker already in place on ground floor level. The LSS frames are placed in a 6-metre radius around the Monolith, with the bottom of each frame sitting on basement level of the Monolith. They provide the interface from the 42 port tubes to the neutron guides.

Target high bay

In preparation for a clean room installation around the Target Monolith, the high bay is being meticulously cleaned, from ceiling to floor. In a few weeks’ time, three-metre-high protective walls with an entrance sluice, changing area and material storage locations, will be built. This is to ensure an as-clean-as-possible environment when the installations inside the Monolith vessel starts. Shielding blocks will be stacked inside, leaving a space to lower the moderator equipment and Target wheel later this year.

Target wheel

The Target wheel, which was installed in a designated space inside the Target Mock-Up and Test Stand (MUTS) last week, will be subject to handling and rotation tests. It sits on the basement level of the MUTS in the Transport Hall building, within a clean room confinement. Next step will be to install the shaft and drive unit.

Test Stand 4

Preparations are underway to provide a space for testing the second Ion Source, delivered by in-kind partner INFN, Italy, with the purpose to act as a spare and future upgrade of the existing Ion Source. The workshop is currently located in the north part of the Klystron Gallery, adjacent to Test Stand 3 and the workshop for the Drift Tube Linac structures.

The fence has been rebuilt and installation of electrical and cooling racks will follow.

Siteplan Archive
D03 BIFROST BWI

Beam wall insert for BIFROST in place.

D03 BIFROST BWI Surveyor

Precision is key! The ESS Survey, Alignment & Metrology team aligning the neutron guide.

D01 ODIN cabin

Lights are on in the ODIN control cabin.

D02 high bay clean

Target high bay is getting clean.

D03 bunker crane installation

Test lifts for the newly installed bunker crane will be performed soon, with loads of up to 25 tonnes.

D01 DREAM roof elements

The heavy roof elements are lifted in place for the DREAM cave.

D02 LSS frames west sector

Eight LSS frames are in place around the Monolith. The basement parts are yet to be completed.

G02 TS4 second ion source

The second Ion Source at ESS.

BIFROST neutron optics

Internal optics of a neutron guide.

G01 tunnel

Green roof over the ESS Accelerator tunnel.

© ESS. All rights reserved

Footer menu

  • Login
  • Privacy
  • SRE ESS