Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

27 October 2023

Accelerator

Drift Tube Linac 5, installed in the ESS Normal Conducting Linac a month ago, has been connected and is subject to vacuum leak tests.

Radio-frequency power systems and the distribution system is under testing in the gallery building.

All 13 double-cavity spoke cryomodules are now in place in the superconducting part of the linac. Alignment, welding, installation of doorknobs and water manifolds, cable connections and labelling – this is all part of a busy installation scope.

The first medium beta cryomodule as part of the elliptical series installation is in place, with welding of the pipes to the valvebox completed.

Linac Warm Units will be installed in-between all cryomodules, using a cleanroom tent for particle-free installations.

Cooldown tests of elliptical cryomodules delivered from French In-Kind Partner CEA continue in the on-site test stand.

All 26 radio-frequency power stations for the spoke section are in place and have been tested with low power in the Gallery building. Soak testing, over a longer period of time, is under way.

Target

The 24/7 rotation tests of the Target Wheel are under way, with the goal of accumulating 1,000 hours of test data. The helium rotary unit, installed on top of the shaft, is part of this test cycle. Final cleaning and measurements will prepare the wheel and part of the shaft for installation into the Monolith vessel later this year.

The temporary 65-ton high bay overhead crane has been dismantled and disposed of. The L3 special crane now services the entire Target high bay.

The Proton Beam Window, separating the Accelerator ultra-high vacuum environment to the rough vacuum of the Target Monolith, has been successfully cleaned, pre-tested and sent off to University West in Trollhättan, Sweden, for luminescent coating. Pressure tests will be performed before the component is sent back to the supplier in Spain for final assembly.

The Light Shutter System, installed for the 15 active beam ports and the Test Beamline, has been tested and approved. The next step will be to install the Bridge Beam Guide, including optics for the first part of the neutron extraction system.

Cryogenic Moderator System

Preparations to start the next round of commissioning of the Cryogenic Moderator System are under way. This will include performance tests at various temperatures to verify that all equipment works as intended. The first part of the test will be done with Nitrogen, and in the second part cooldown to 17K using helium from the Target Moderator Cryoplant (TMCP) is planned.

The system, including the hydrogen transfer line and distribution valvebox in Tom’s Room, will be pressurized to be able to run the tests. Circulation will however only involve the CMS cryostat and jumper spool box.

The CMS cryostat consist of a hydrogen and a helium loop. Cold hydrogen, cooled by the helium loop, will be circulated via a transfer line to the Target Moderator System. Cryogenic piping from the distribution valvebox to the connection cell is yet to be completed.

Instruments

ESTIA

The on-site construction of the control hutch for ESTIA is now under way.

SKADI

The sample environment cave walls are in place, with painting in progress. The SKADI heavy shutter was received and placed inside the bunker.

LOKI

30 detector modules have been installed into the front and middle detector frames, inside the LOKI detector vessel.

The detector modules were designed, manufactured and tested by UK in-kind partner STFC/ISIS. Prior to the installation, they were pre-tested at the Source Testing Facility at Lund University.

Read more about the first neutron detectors arriving at ESS.

BIFROST

Motion control tests of a cryogenic tank on the BIFROST sample stage, has started. This cryo tank, which will contain the sample, can be rotated and tilted.

NMX

The installation of the 160-metre-long neutron guide system, from the Target to the sample position, is under way for NMX.

Siteplan Archive
D03 LOKI detector team

LOKI detector systems under installation.

G01 NCL DTL5

Drift Tube Linac 5 in the Normal Conducting Linac.

G01 Spoke CMs

A long row of spoke cryomodules in the Superconducting Linac.

G01 SCL vacuum LWU cleanroom

Testing how to fit the cleanroom for the Linac Warm Unit installation.

G01 SCL MB CM

Medium beta elliptical cryomodule in the Superconducting Linac.

G02 Spoke RFPS

RF power stations for the spoke section.

D02 high bay L3 crane

The Target high bay crane.

D02 A2T hydrogen room CMS

Cryogenic Moderator System.

D02 MUTS HRU

Target wheel rotation test with helium rotary unit.

D01 ESTIA and SKADI

Instruments SKADI and ESTIA under construction.

E01 BIFROST cave sample stage

BIFROST motion control tests.

D03 NMX neutron guide installation

NMX neutron guide installation.