Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

09 March 2020

Target

The last two castings for the concrete shielding around the Dump to Target area will take place this week. Assembly of sandwich panels is ongoing on  both sides of the Active Cell high bay, and roof works will soon follow. The crane beams for the temporary crane will be extended from the Utility/Monolith so that the crane can move all the way to Transport Hall. It is scheduled to be operational for the full length of the high bay by the end of April, in time for the ESS Monolith vessel installation on site.

The roof trusses for Experimental Hall 2 are currently under adaptation, in order to fit the steel structure already in place. Mounting is expected to start next week. Experimental Hall 1 superstructure is also scheduled to start beginning of next week. Steel for the second part of the Beamline Gallery will follow in April.

Construction of the 'control hutch' for the BIFROST instrument has been completed. It will be used as an office for future scientists when ESS goes into operations, and may also be used in the near future for planning and preparations for the installation teams that are working in the area. This is the first of up to seven control hutches to be built in the Beamline Gallery area. Precast elements and steel for the walls and roof structure of the NMX cave are currently being manufactured by the supplier. Installation on site is set to start before the end of March. The cave, which will be about seven metres tall, will contain a small overhead crane and a safety door, to enter the cave through a chicane, and all surfaces will be painted with epoxy. Construction of the NMX cave is expected to be completed by June 2020.

Work has also been carried out in the Beamline Gallery as part of a common shielding project. The goal is to establish a common procedure that applies to all shielding blocks for all beamlines at ESS. First the floor is marked, then base blocks are put in place, and lastly surveying is performed to ensure the blocks are aligned within strict tolerances.

Accelerator

The beam dump and T-copper has been successfully positioned inside the beam dump cave, and covered with steel and concrete shielding. At the same time, cooling water pipes have been installed inside the cave, all pressure tested and x-rayed.

Work is ongoing with cable terminations in the first 50 metres of the Accelerator. Preparations to move the first ESS serial-produced modulator from Test Stand 3 to its permanent place in the normal conducting section of the Gallery. The purpose of a modulator is to convert incoming high voltage to electrical pulse power, suitable for the klystrons - a power amplifier that, in turn, converts the power to radio frequency waves, fed down to cavities in the Accelerator - via waveguides installed through the stubs. Each of these state-of-the-art, in-house-developed modulators can supply the power needed for four klystrons.

Siteplan Archive
© ESS. All rights reserved

Footer menu

  • Login
  • Privacy
  • SRE ESS