Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

06 October 2020

Accelerator buildings

A small team from Italian in-kind collaborator INFN has arrived at the ESS site and is now working with the Drift Tube Linac (DTL) tanks inside a workshop in the accelerator buildings. The first two tanks were vacuum tested, and all drift tubes, mounted and aligned.

Waveguide testing is ongoing in the DTL section in the tunnel and the connecting structure in the RF cell on the Klystron Gallery side, getting this area ready for the first DTL tank installation in the linac.

The first proper cryomodule (CM01) that arrived from French in-kind partner CEA last week is in the preparation area outside the Test Stand 2 bunker. Once all tests have been successfully performed on the cryomodule prototype that is currently inside the TS2 bunker, tests will begin on CM01.

Completion works for the helium collector piping in the high beta and medium beta sections of the tunnel are ongoing, and the piping installation, which runs through the Cryo Transfer Line gallery, is now performed inside the Coldbox hall.

Target buildings

Commissioning of the overhead crane serving the Target high bay continues – now with test weights attached to the hook. It will be operational on 23 October.

Metal cladding of the high bay part of the Transport Hall to the Target building progresses, as the first vertical metal sheets have been mounted.

Sandwich panel installation for the Accelerator to Target (A2T) building is substantially completed, whilst roofing and installation of a parapet is ongoing. Inside the building internal finishes including painting is ongoing, and gypsum walls are following.

The 32-metre-high A2T stack will be delivered and installed during the first part of October.

Experimental Halls & Labs

The last two roof trusses for Experimental Hall 1 in the east end will be mounted shortly, at the same time as roofing continues and the curved roof progresses.

Sandwich panels for the lab adjacent to Experimental Hall 2 are soon to be fully installed, and shortly, mounting of the last steel columns for the east gable of the hall will follow.

With the scaffolding tower for the installation of the bunker crane dismantled, fences are now in place around the working area for the neutron shielding bunker inside Experimental Hall 2. Preparation of the area, including dust binding of the floors, is ongoing and the first part of the steel frame is coming up soon.

Curtain wall façade installation is ongoing for the lab building to Experimental Hall 1. When completed, it will look similar to the Target Entrance glass facades. Roofing is done and interior works, including gypsum walls and in-wall installations, are ongoing.

Part 2 of the steel frame for the Beamline Gallery is completed, and TRP roofing will follow shortly.

Installation of the two labs to Experimental Hall 3 continues, as well as electrical infrastructure works in the hall.

The BIFROST instrument cave construction will soon reach the fourth layer of shielding walls.

Civil construction

Installation of a waterproof membrane and top-fill over the Dog Leg ramp - the last part of the Accelerator tunnel before reaching the Target building, is ongoing. The membrane consists of three layers ensuring waterproofing, which are topped off with a layer of soil. Seed planting will follow later this autumn.

Siteplan Archive
Drift Tube Linac (DTL) tanks in preparation in the workshop

Drift Tube Linac (DTL) tanks in preparation in the workshop.

The inside of a Drift Tube Linac tank.

The inside of a Drift Tube Linac tank.

Target entrance building glass facades with steel cladding ongoing on high bay level

Target entrance building glass facades with steel cladding ongoing on high bay level.

Credit: ESS

Experimental hall 1 - roof trusses and the south "sombrero" curved roof.

Experimental hall 1 - roof trusses and the south "sombrero" curved roof.

Steel structure complted for the Beamline Gallery part 2

Steel structure completed for the Beamline Gallery part 2.

Commissioning of the Target high bay crane.

Commissioning of the Target high bay crane.

Steel cladding for the Target building.

Steel cladding for the Target building.

Target Monolith and the bunker crane consoles.

Target Monolith and the bunker crane consoles.

Facades for the lab to Experimental Hall 1.

Facades for the lab to Experimental Hall 1.

Infrastructure installations in Experimental Hall 3.

Infrastructure installations in Experimental Hall 3.

A2T sandwich panel installation almost complete.

A2T sandwich panel installation almost complete.

Installation of a watertight geo-membrane for the last part of the Accelerator tunnel.

Installation of a watertight geo-membrane for the last part of the Accelerator tunnel.