Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

08 November 2021

Accelerator

Beam commissioning

In the normal conducting linac, beam commissioning activities continue according to schedule. Plasma conditioning in the ion source and reconditioning of the RFQ section have started. Beam extraction is next.

Linac Warm Units

Particle-free installation of Linac Warm Units is under way in the ESS Accelerator tunnel, with the works performed by the ESS Vacuum team inside a clean room confinement, using a dummy pipe representing the cryomodules. In total, there will be 43 superconducting and 28 normal conducting Linac Warm Units. Set-up of the clean room is prepared every Friday afternoon for particles to settle over the weekend and installation to be performed on Mondays.

Cryomodule testing

RF power and cooling tests of the second serial-produced medium beta cryomodule is ongoing, with 2K helium flow to the cavities of a cryomodule inside a test stand bunker.

Target

NN Bar and port tubes

The so called NN bar, a stainless-steel component made up of two parts – the NN bar itself and an adapter – has been assembled and lifted to its permanent position in the area surrounding the Target Monolith vessel. 39 port tubes, providing the housing for the first few metres of the neutron extraction system, are subject to welding to the Monolith vessel.

Technical Gallery

About 50 penetrations in the 1,3-meter-thick heavy concrete wall separating the Technical Gallery from the Active Cells, are being closed with steel plugs. In-kind partner UKAEA, responsible for the remote handling system for the Active Cells, are performing the works.

ESS Sombrero

The cladding for the cantilever roof encapsulating the Target building and adjacent instrument halls, is close to completion. Just a few gaps and joints remain to be equipped with panels of aluminium lamellae.

Experimental Halls

LOKI and FREIA

This week the installation of a common control hutch building for the instruments LOKI and FREIA started inside Experimental Hall 2. Built up of precast concrete blocks, the hutches will serve as sample preparation area and control room for the two instruments. LOKI and FREIA are both in-kind contributions from STFC, UK.

Installation of base components for the LOKI beamline and cave continues. A frame of steel plates is in place for the cave perimeter and concrete plinths have been placed close to the bunker. Drilling for floor anchors continue, as more base plates and the structure for the detector vessel to be placed inside the cave are added.

BIFROST

A staircase to roof level has been installed for the BIFROST instrument cave inside Experimental Hall 3. The spectrometer vessel, which has been lifted out from the cave, will be subject to cadmium coating.

Beamline Gallery

Shielding blocks are stored inside the fan shaped E02 beamline gallery, with space for eight beamlines to the instruments in Experimental Hall 3. For CSPEC and BIFROST, parts of the lower shielding blocks are in place. Upper shielding blocks have started for the CSPEC beamline.

Construction project

Landscaping

All green landscaping for the 70 hectares ESS site is complete, including planting and road signs, and next week the sectional handover inspection for remaining civil areas is planned.

Two thirds of the site consist of green landscaped areas.

Siteplan Archive
D01 to D08 sombrero

The cantilever roof cladding is close to completion.

E02 overview

Overview of the beamline gallery, with eight beamlines to the instruments in Experimental Hall 3.

G01 LWU clean room installation

ESS Vacuum team working inside a clean room.

D03 LoKI

Outline for the LOKI instrument beamline and cave.

E02 CSPEC

Upper shielding blocks for the CSPEC instrument beamline.

G04

Helium is supplied from large tanks, compressed in the cryo compressor building, cooled in the coldbox hall and fed to the cryomodule cavities via thermal pipes.

D03 hutch for LoKI and FREIA

Installation of control hutches for instruments LOKI and FREIA.

Landscaping G02

Landscaping of the 70 hectares ESS site is completed.

D02 Monolith NNbar

NN bar in position in the R6 area surrounding the Target Monolith vessel.

D02 Monolith port tubes

39 port tubes are welded to the Monolith vessel.

D02 TG penetration plugs

ESS-blue steel plugs for penetrations.

D02 TH inside NNbar

Assembly of the NN bar and the adapter, before lifting in place.

ESS flight scanning

Skanska surveyor's flight scanning of the ESS site, 27 October 2021.

© ESS. All rights reserved

Footer menu

  • Login
  • Privacy
  • SRE ESS