Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

07 February 2022

Accelerator

Beam commissioning/RF conditioning

In the Normal Conducting Linac, the MEBT bunchers are currently in preparation for conditioning. There are three buncher cavities attached to the Medium Energy Beam Transport (MEBT) section of the linac, which were not included in the first stage of beam commissioning completed in December 2021.

MEBT bunchers provide longitudinal focusing (bunching) of the beam coming from the RFQ section. Conditioning involves injecting RF power to the copper-mantled cavities, at increasing power levels.

The first Drift Tube Linac tank (DTL1), fully installed in the tunnel, is also being prepared for RF conditioning.

The next stage of beam commissioning will entail sending beam from the Ion Source, through the LEBT, RFQ, MEBT and DTL1, landing the beam in the DTL1 faraday cup. This is scheduled for later this year. Prerequisites for beam commissioning include completion of all associated RF conditioning activities and a Safety Readiness Review.

Spoke Linac 

Positioning and alignment of the header units for the spoke linac's cryogenic distribution system continues. Tack welding has been performed on the first few units.

Cryomodule testing in Test Stand 2

The third medium beta elliptical cryomodule has been installed inside the test bunker and warm RF conditioning is ongoing, sending radiofrequency power to the cavities. The two previously tested modules are stored, awaiting installation in the linac.

Another cryomodule for the spoke section, tested at the Freia lab in Uppsala, is arriving to ESS shortly (number 7 out of 13). Inspection and tool tests in the ESS workshop and labs building will follow.

Target

Monolith

Welding of the 39 port tubes as well as the NN bar frame and adapter was successfully completed. Next, welding of the upper and lower part of the Monolith vacuum vessel is planned.

The first few shielding blocks for the Monolith inner shielding have been placed inside the vessel, with the bulk of this installation to be performed later this year.

The Light Shutter Systems (LSS) frame, partly pre-installed in the B02 Technical Workshop, will also be subject to installation in the coming months. The LSS frame will sit close to the port tubes around the circular opening of the Monolith base slab.

Experimental Halls

DREAM

Precast hollow concrete blocks have been placed for the second level walls of the DREAM scientific cave and this week the structure was filled with fresh concrete. 

ODIN

Soon, construction of the control hutch and sample preparation area for ODIN will commence inside Experimental Hall 1. The precast building will have two floors.

ODIN occupies one of the beamlines in the south sector bunker, and is located next to DREAM in Experimental Hall 1.

Bunker infrastructure

Console, raceway and cable tray installations continue inside the neutron shielding bunker on both sides of the Monolith.

These cable containments will be used for cabling to the Chopper, Motion, Vacuum and Monitor systems, as well as for PSS systems and utilities within the bunker.

Siteplan Archive
D01 bunker infra

Neutron shielding bunker infrastructure works in Experimental Hall 1.

D02 Monolith inside vessel port tubes

Port tubes seen from the inside of the Monolith vessel.

D02 Monolith inside vessel proton beam entry

Circular opening for protons to enter inside the Monolith vessel, where the target wheel will be placed.

G01 FEB 090 MAS-PAS

The orange Material and Personnel Access Stations (MAS/PAS), for entry to the Normal Conducting Linac (NCL), located on basement level of the Front End building are part of the Personnel Safety System (PSS).

G01 spokes header units tack welding

The piping in-between valve boxes, called header units, are welded together in the spoke linac.

G01 spokes welding

Welding ongoing in the spoke linac.

D01 DREAM cave casting

Casting of walls for the instrument cave for DREAM.

G01 NCL DTL

Drift Tube Linac tank 1.

G01 MEBT RFQ

Medium Energy Beam Transport (MEBT) and Radio-Frequency Quadrupole (RFQ) sections of the linac.

© ESS. All rights reserved

Footer menu

  • Login
  • Privacy
  • SRE ESS