Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

21 November 2022

Accelerator

Cryogenic Distribution System commissioning

We are approaching cooldown of the Cryogenic Distribution System. With just a few weeks left of preparations, final works on the end box is ongoing. Pressure transmitters have been mounted, and the pipe connection to a rupture disc is under installation.

Cryomodules

Cooldown of first high beta cryomodule (is in progress inside the Test Stand 2 bunker.

Another high beta cryomodule was delivered from CEA this week, which means four out of a total 21 are at ESS.

French in-kind partner CEA are responsible for the fitting of high beta cavities delivered from STFC-UK and medium beta cavities from INFN-Italy into the cryomodule tanks, before delivering them to ESS for further testing.

Drift Tube Linac

The last Drift Tube Linac tank to be installed before the next round of RF conditioning and subsequent beam commissioning – DTL2 – is under preparation on the transport trolley.

The water manifold adapter, delivered from INFN, was fitted onto DTL3 in the tunnel. Vacuum testing is next.

Target

MUTS

In the Target Mock-Up and Test Stand, rotation tests of the Target wheel assembly continue.

Monolith

The cleanroom expansion around the Target Monolith has been completed. There is now space inside for a welding workshop and a chemical cleaning area.

Instruments

Test Beamline

The Test Beamline cave walls are in place and have been painted. In-cave ducts were installed through drilled holes in the concrete floor.

LOKI

Installation of raceways continue along the cave walls. The collimation vacuum vessel was delivered from AVS/Cadinox (Spain). The collimation system will be installed onto already installed plinths on the support structure adjacent to the outer wall of the north sector bunker. Its job is to control the size and divergence of the beam through various slits and guides to be installed inside the vessel.

DREAM

In the south sector of the Experimental Hall 1, an in-bunker chopper base is in place for DREAM. Recently the bunker wall insert was installed.

NMX

A base structure for the in-bunker neutron guide is in place, and the first vacuum tests of the three guide sections were performed. NMX occupies beamline W1 in the west sector.

NSS In-bunker

NBOA cooling pipes are in place within the LSS frames in all four sectors inside the bunker.

NSS is ready for installation of Neutron Beam Port Inserts and Plugs, starting in the north sector.

Chopper workshop

Construction of a chopper workshop is completed. It will be used to prepare and test choppers for all instrument beamlines. 

Siteplan Archive
D02 TH Target wheel spinning MUTS

Target Wheel appears to be spinning at the speed intended: 23.3 rpm.

D02 Monolith cleanroom

Cleanroom on the Target high bay.

D02 bunker R6 NBOA cooling

Cooling pipe system for the Neutron Beam Optics Assembly.

D03 LOKI cave raceways

Electrical raceways along the walls of the LOKI instrument cave.

D03 TBL cave-3

Inside the Test Beamline cave.

G01 end box pipe

Piping for the end box of the Cryogenic Distribution System in the ESS accelerator tunnel.

G02 CM36 delivered

High beta cryomodule delivered from CEA, France.

G02 DTL workshop DTL-2 on trolley

Drift Tube Linac 2 getting ready for installation.

G02 DTL workshop DTL-5 module

Inside a module of Drift Tube Linac 5.

© ESS. All rights reserved

Footer menu

  • Login
  • Privacy
  • SRE ESS