Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

28 June 2021

Target Monolith

In the Target Monolith, a staircase is now in place to provide access to the inside of the monolith vessel tank for welding of the port tubes to the 39 openings in the side of the vessel. These works will start after the Swedish summer holidays. In preparation for this, bottom plates, covering the pinkish-red base plate already installed around the Monolith and serving as foundation for the port tubes, will be installed.

Port tubes are square-shaped steel ducts, one for each window in the monolith vessel, which will serve as housing for the neutron guide systems to be installed here.

Active Cell

Preparations have started for the installation of floor valves for the hatch openings from the high bay to the Active Cells.

Two floor valve assemblies will be installed onto the high bay, covering the circular openings down to the process and maintenance cells. A shield door mechanism will allow the valve to be opened to lift casks into the Active Cells. This installation is part of the UK in-kind contribution to the ESS Active Cell, via in-kind partner, STFC & UKAEA.

Target roof

Panels comprising aluminium lamellae are installed on the cantilever roof above the Target Entrance building.

The cantilever steel structure, including all adjustments and movement joints, is scheduled for completion by the end of July. All cladding panels will be in place by mid-October.

NCL

RFQ conditioning is ongoing, where RF power is sent to the cavities of the Radio-Frequency Quadrupole (part of the Normal Conducting Linac). The aim is to reach 3 MW of power during the six-week conditioning window (open until early August). RFQ conditioning is conducted on site in close collaboration with ESS's French in-kind partner, CEA.

Cryomodule testing

In-bunker testing of the first elliptical cryomodule continues. RF conditioning is under way and will be followed by cool-down.

Another serial-produced medium beta cryomodule will arrive on site early July, and will be subject to the same set of tests inside the test stand 2 bunker. Testing of the cryomodules is manages by ESS's Polish in-kind partner, IFJ-Pan.

RFPS – spoke section

Installation of the first two RF power stations for the spoke section is complete in cell 120. Energisation is next. Another RF power station is subject to tests with a dummy load in test stand 3, with three more units delivered and ready for testing. In total there will be 26 RF power stations, powering the 13 spoke cryomodules.

Experimental Hall 1 & 2

Floor treatment, including touch-up floor grinding and dust binding, is nearing completion in the two Experimental Halls for short instruments. The east end of both halls remains to be completed.

For the ESTIA instrument, installation of the Selene guide and concrete shielding blocks for the east sector of the neutron shielding bunker around the Monolith has started inside Experimental Hall 1. A few concrete blocks are in place and the Selene guide will be inserted so that mounting of concrete blocks for the curved wall can continue.

Experimental Hall 3

Support blocks for the neutron beamline for BIFROST are in place just next to the instrument cave.

Vacuum tests for the first part of the neutron guide housing for CSPEC are completed, and installation of more lower shielding blocks towards part 2 of the Beamline Gallery building, will follow.

Eight electrical distribution boards (racks) are in place in the large, curved hall. These will serve all instrument caves in Experimental Hall 3 with power.

Siteplan Archive
D01 east bunker

The first few concrete blocks for the east sector bunker inside Experimental Hall 1 are in place.

D01 hall

Experimental Hall 1, where floor finishing works are almost completed.

D02 high bay floor valves

Preparations for the installation of floor valves to Active Cells are in progress on the Target high bay.

D02 Monolith from HB

A stair tower has been installed for entry to the Target Monolith vessel.

D02 Monolith

Port tubes will be welded to all 39 openings of the Target Monolith vessel.

D02 Target Entrance

Cladding for the cantilever roof structure above the Target Entrance building is installed.

E01 BIFROST shielding blocks

Upper shielding blocks in place for the BIFROST beamline.

E01 BIFROST shielding blocks

Support blocks next to the BIFROST instrument cave.

E01 CSEPC vacuum housing

Vacuum housing in place for the first part of the beamline for CSPEC.

G01 MEBT RFQ

RFQ conditioning is ongoing in the Normal Conducting Linac.

G02 TS2 bunker

Cryomodule tests are under way in a test stand bunker.