Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

26 September 2022

Accelerator

Drift Tube Linac (DTL)

Installation of DTL4 is ongoing in the Normal Conducting Linac. Cabling for cooling water and electrical is being connected.

DTL3 is scheduled for transport to the tunnel in October.

CDS Spokes

The Cryogenic Distribution System (CDS) for the Spoke section is subject to leak tests. The ESS vacuum group is working alongside Polish Kriosystem to repair any small leaks detected. 

Proton Beam Drift Room

The 12,3-metre-long Proton Beam Drift Room pipe is in place and leak tested. Concrete plugs have now been put in place, filling up the space around the pipe.

Target

Mock-Up and Test Stand (MUTS)

The shaft connection to the Target wheel has been vacuum tested and approved. The drive unit was assembled on top of the shaft, with electrical connections ongoing. The Target Monitoring Plug has also been reassembled.

Inner shielding

The south grid shielding block has been placed inside the Monolith vessel. The piece weights 28 tonnes and will be followed by the equivalent block on the north side. These units have cooling pipes welded to the steel blocks.

Instruments

Neutron guide optics assembly

With five Neutron Beam Port Inserts recently delivered to site, optics assembly has been completed for the FREIA insert, with leak tests following.

Next in line is the DREAM insert, to be followed by ESTIA, SKADI and VESPA.

All optics integration is performed inside a cleanroom tent.

Final assembly of the Neutron Beam Port Plugs (NBPPs) is ongoing in the E01 hall, with installation in the north sector to follow.

LOKI

The installation of shielding steel walls has started for the LOKI cave. A neutron absorption material (a 5 mm thick layer of B4C, i.e. Boron carbide) has been attached to the inside of the wall panels, with the purpose to prevent backscattering of neutrons to the detectors.

Cable pulling in the under-tank raceways will follow – with parts of the walls in place.

BIFROST

Commissioning tests for the BIFROST bandwidth chopper continues.

Siteplan Archive
D02 Monolith inner shielding

Installation of Monolith inner shielding under way.

D02 Monolith inner shielding

Inner shielding blocks inside the Monolith vessel.

D02 MUTS drive unit

The Target wheel drive unit has been assembled on top of the shaft.

G01 A2T PBDR plug

A concrete plug is in place for the narrow space where the proton beam drift room pipe is installed.

G01 CDS-Sp leak test

The cryogenic distribution system for the Spoke Linac is under leak testing.

G01 NCL DTL4 installation

Installation of Drift Tube Linac 4 is ongoing.

E01 tent FREIA NBPI vacuum test

Leak tests are ongoing for the FREIA Neutron Beam Port Insert, with integrated optics.

E01 tent DREAM NBPI

The DREAM Neutron Beam Port Insert will be equipped with optics.

D03 LOKI shielding walls

Walls for the LOKI cave are being installed.

© ESS. All rights reserved

Footer menu

  • Login
  • Privacy
  • SRE ESS