Skip to main content

Main navigation

  • About ESS
    • The ESS Mandate
      • The ESS Story
    • ESS Organisation
      • Governance
        • Council Meetings
      • Committees
    • News & Press
      • Media Bank
      • Web Articles
    • Publications
    • Legal
      • ESS Privacy and Cookies Policies
    • Contact ESS
  • Science & Instruments
    • Science Using Neutrons
      • Chemistry of Materials, Magnetic & Electronic Phenomena
      • Engineering Materials, Geosciences, Archeology & Heritage Conservation and Fast Neutron Applications
      • Life Science & Soft Condensed Matter
      • Particle Physics
      • Future Science: What will we see at ESS?
        • Safer, lighter and stronger engineering materials
        • Fine-tuning 3D printing for space exploration
        • New tools in the fight against air pollution and global warming
        • Exploring the powerhouse of life
        • Better superconductors to improve cancer diagnosis
        • Bringing the most effective cancer drugs to market sooner
        • Lighting the way to next generation solar energy
        • New battery materials for a renewable energy future
        • Delivering on the Promise of Big Data
        • Putting a finger on the disorder essential to life
        • Unlocking the secrets of water
    • Instruments
      • BEER
      • BIFROST
      • CSPEC
      • DREAM
      • ESTIA
      • FREIA
      • HEIMDAL
      • LOKI
      • MAGIC
      • MIRACLES
      • NMX
      • ODIN
      • SKADI
      • T-REX
      • VESPA
    • Data Management & Software Centre
      • Computing Centre
    • Labs and Sample Environment
      • PREMP
      • FLUCO
      • TEFI
      • DEMAX
      • SULF
      • MESI
    • Committees
    • For Users
    • ESS Scientists
    • Science Events
    • Highlights of Published Papers
  • Technology
    • Accelerator
      • How It Works
      • LINAC
      • Beam Physics & Beam Diagnostics
      • Cryogenics
      • Vacuum
      • Radio Frequency Systems
      • Accelerator Test Stands
    • Target
      • How the Target works
    • Controls
  • Building ESS
    • The Building Project
      • Site, Architecture & Sustainability
      • Licensing & Planning
      • Radiation Protection & Safety
    • Progress reports from the ESS site
    • Aerial Views
  • Partnerships
    • In-Kind Contributions
    • Doing business with ESS
      • Supplier Information
      • Procurement Listings
      • Contract Award Notices
    • Grants
      • ESS in the HALRIC Project
  • Careers
    • Vacancies
    • Living & Working in Scandinavia
      • In Sweden
      • In Denmark
    • ESS Family Support
Webmail
ESS Inside
  • About ESS
    The ESS Mandate ESS Organisation News & Press Publications Legal Contact ESS
  • Science & Instruments
    Science Using Neutrons Instruments Data Management & Software Centre Labs and Sample Environment Committees For Users ESS Scientists Science Events Highlights of Published Papers
  • Technology
    Accelerator Target Controls
  • Building ESS
    The Building Project Progress reports from the ESS site Aerial Views
  • Partnerships
    In-Kind Contributions Doing business with ESS Grants
  • Careers
    Vacancies Living & Working in Scandinavia ESS Family Support

Secondary navigation

  • Publications Portal
  • Contact
  • Press
  • Behind ESS
Home

Main navigation

  • About ESS
    ess long pulse slide
    The ESS Mandate
    organisation
    ESS Organisation
    News and Press
    News & Press
    alt
    Publications
    legal and ip
    Legal
    contact ess
    Contact ESS
  • Science & Instruments
    Science using neutrons
    Science Using Neutrons
    instruments
    Instruments
    dmsc
    Data Management & Software Centre
    sss magnet
    Labs and Sample Environment
    Inauguration
    Committees
    Lab Kat
    For Users
    Scientist at work
    ESS Scientists
    diffraction
    Science Events
    Science papers image
    Highlights of Published Papers
  • Technology
    ess accelerator
    Accelerator
    target monolith
    Target
    ess ics
    Controls
  • Building ESS
    Building project
    The Building Project
    weekly construction updates
    Progress reports from the ESS site
    ess aerial snow
    Aerial Views
  • Partnerships
    tartu pump probe
    In-Kind Contributions
    procurement
    Doing business with ESS
    partner day
    Grants
  • Careers
    careers
    Vacancies
    scandinavia
    Living & Working in Scandinavia
    family
    ESS Family Support

01 November 2021

Accelerator

Beam commissioning begins

With a system permit and authorisation in place, on Thursday 28 October the beam commissioning activities in the normal conducting linac started. This phase of conditioning, to include proton beam from the Ion Source to the Medium Energy Beam Transport (MEBT) section, is expected to go on until the end of the year.

Klystron Gallery

High power site acceptance tests for the DTL3 klystron, modulator and RF distribution system has been performed.

All four RF power stations are now in place in spoke cell 120a, with local power tests following.

Works in the DTL workshop, involving assembly, tuning and bead pulling for the Drift Tube Linac tanks, are ongoing.

Cryomodules testing

There are four serial-produced medium beta elliptical cryomodules on site, with another one scheduled for delivery next week. One cryomodule has already been fully tested and will go to storage, one is currently subject to RF power and cooling tests inside the test stand 2 bunker, one is in the incoming reception area in TS2 and the fourth one is in the waiting area in test stand 4, ready to go inside the test stand 2 area once a free spot is available.

Target

Port tubes

All 39 port tubes have now been delivered to ESS.

The NN bar and NBEX adapter will be delivered sand installed this coming week. The NN bar contains three port tube inserts, including one for the test beamline, the first to receive neutrons at ESS.

Active Cells

The lower and upper intrabay doors separating the process cell from the maintenance cell are in place, with electric signal installations now ongoing. A wire connection from the upper door to the drive unit assembly on the other side of the wall inside Transport Hall has been made and installation work is ongoing.

Up on high bay level, the two floor valves down to the Active Cell are in place, with electrical installations for the opening mechanism being finalised.

Cryo Moderator System

The delivery of the Cryo Moderator System (CMS) took place this week. It is currently stored inside G04 cryo compressor building, for lifting to take place during November. A large crane will be installed on the ground outside the Target building and a complex lift operation above the large roof structure into the top floor of the Accelerator to Target building will follow.

Test installation of explosion hatches will be performed prior to the lift-in of the CMS.

ESS Sombrero

Cladding for the cantilever roof is ongoing in all remaining areas: In the corner between Experimental Hall 1 and D08 lab and above the Accelerator to Target building. Joints requiring special panels remain to be completed.

Target Entrance

The Target Entrance building is ready for handover and the building has now been sealed off for the final inspection to take place. Handover to ESS is scheduled for December 2021, the same as for the rest of the remaining buildings.

Experimental Halls & Labs

Bunker cranes

The bunker crane runway reinforcement works are now completed also on the south side, inside Experimental Hall 1.

D08 RML lab

The radioactive materials lab (RML) on the ground floor of lab building D08 has been equipped and in-ceiling installations completed. Two glove boxes, currently stored in lab E04, will be moved here. These come as an in-kind contribution from the University of Tartu, Estonia.

LoKI instrument

Concrete plinths and base plates for the LOKI instrument have been installed, from the shielding bunker to the location of the scientific cave to be built inside Experimental Hall 2.

Landscaping and earthworks

This week the Skanska civil works team has planted trees and shrubs around site, completing the landscaping activities on site.

Siteplan Archive
G01 NCL.

Normal Conducting Linac - from Ion Source to MEBT section.

Civil tree planting

Making it green - the Skanska civil team are sowing seeds and planting trees, here outside the H09 waste building.

D01 A2T sombrero

Closing the gaps in the cantilever roof; here above Experimental Hall and A2T.

D01 bunker crane

Bunker crane reinforcement works in the D01 hall completed.

D01 to D08 sombrero

ESS sombrero installation in the corner between D01 experimental hall and D08 lab.

D02 AC floor valves

Two floor valves covering the circular openings down to the Active Cells.

D02 Active Cell LID UID

Lower and upper intrabay doors in the Active Cells.

D02 Monolith port tubes

Port tubes surrounding the Monolith vessel.

D02 Target Entrance top floor corridor

Top floor corridor of the Target Entrance building.

D03 D04 sombrero

ESS sombrero roof as seen from the roof of Experimental Hall 2.

D03 LoKI baseplates

LoKI - a frame of base plates and concrete plinths are in place.

D08 RML lab

Installation works for the RML lab were performed be Sanber Ltd, as part of the in-kind agreement with STFC, UK.

G02 cryomodule in TS4

Newly delivered cryomodule in test stand 4.

G02 DTL workshop

DTL section under preparation in the DTL workshop.

G02 NCG

Normal conducting gallery - RF power is on.

G02 RFPS cell 120a

RF power stations, tetrode-based RF power amplifiers, containing the modulator. ESS will have 26 of them.